Saturday 24 January 2009

A Saturday Trip to Pachacamac

Today Brenda and the girls and I along with Eduardo made a trip to the worksite. Even though it is Saturday we had to get the showers put in so that the tile workers could keep advancing.
Here is a glimpse of what they have started in one of the bedrooms. They had all 4 bedrooms in house 1 to this stage.

Even Luz the sheep came in to inspect things. She must have liked what she saw because she didn't stick around to tell us what needed to be changed.


While we were inside working, the girls were outside finding something fun to do amongst all the construction materials. After a while, the girls came inside and helped by sweeping the floors for the tile workers.
For those of you who are wondering if things are on hold in Manchay at the Oasis, it is quite the opposite. Things are really moving along there as well. Eduardo and two others are working there everyday doing bricklaying and getting the floors ready for tile. I have been busy doing the layout for the new office and boardroom. I will take some pictures on Monday and post them.



No comments: